FieldWhat to record
Asset / lineMachine name, station, asset number
Date and timeStart of event, maintenance arrival, restart time
Observed symptomNeutral description of what failed to happen
Production impactLine down, reduced speed, quality risk, isolated station, etc.
Initial evidenceAlarms, LEDs, positions, measurements, operator timeline
Recent changesMaintenance, recipe, cleaning, tooling, software, product, utilities
Tests performedInclude important passed and failed tests
Root causePhysical or logical failure mechanism, not only the replaced part
Corrective actionRepair, replacement, adjustment, configuration restoration
VerificationCycles, load, current, pressure, quality, temperature, duration
Temporary conditionsBypasses, substitute parts, reduced speed, monitoring
Follow-upOwner, work order, spare, engineering change, training, PM update